Project scale: 50 cubic meters/d, process flow: regulation tank → primary precipitation → secondary precipitation → reuse of supernatant → reuse of sludge dehydration filtrate
The technical scheme and implementation points of heavy metal wastewater treatment project in Hanzhong City are comprehensively designed in combination with the characteristics of nonferrous metal smelting and electroplating industry in southern Shaanxi and the protection requirements of Hanjiang water source.
Project Name Hanzhong-Heavy Metal Treatment Project
Project Equipment Wastewater reuse sludge dewatering equipment
Process The conditioning tank → primary sedimentation→ secondary sedimentation→ supernatant reuse→ sludge dewatering filtrate reuse