The project solves the problem of terminal coal mine wastewater with high hanging objects, high-iron and manganese, and high salinity through the "graded quality utilization of wastewater-near-zero emission-intelligent management and control" technical chain.
Treat coal washing wastewater from Guoneng Group's Wanzhou Port Coal Storage Base, dock washing water and mine water gushing to protect water quality in the Three Gorges Reservoir Area of the Yangtze River (implement the "Yangtze River Protection Law" first-level protected areas "standards)
Project name: Chongqing Wanzhou Wharf Guoneng Coal Mine Wastewater Treatment Project
Treatment water volume: 40 cubic meters/d
立即申请FyhoneOS人工智能污水处理控制系统免费试用 我要试用 >