Pari Town Water Factory

The project scale is 1000m³/day and adopts the process of flocculation precipitation + valveless filter + sodium hypochlorite disinfection + sludge treatment system. The effluent water standards meet the "Sanitary Standards for Drinking Water"(GB5749 -2022) and the "Urban Water Supply Water Quality Standards"(CJ/T206-2005)

项目背景

The construction and operation of the water supply plant in Pari Town (located in Yadong County, Shigatse City, Tibet Autonomous Region, with an average altitude of 4360 meters) is a typical challenge and breakthrough in safe water supply in alpine, high altitude, and border areas. Its core task is to provide stable, compliant and freeze-resistant drinking water in extreme environments, while overcoming multiple constraints such as energy, climate, and technical maintenance.

立即申请FyhoneOS人工智能污水处理控制系统免费试用